靖江突杖商务服务有限公司

當(dāng)前位置:
首頁 >> 外語類 >> BEC >> 模擬試題>> 正文

2013年2月商務(wù)英語每日一練2.19

發(fā)表時間:2013/2/19 10:47:58 來源:互聯(lián)網(wǎng) 點擊關(guān)注微信:關(guān)注中大網(wǎng)校微信
關(guān)注公眾號

PART TWO

Questions 8-12

. Read this memorandum.

. Choose the lest sentence from the list A-I to fill each of the blanks.

. For each blank (8-12) mark one letter (A-I) on your Answer Sheet.

. De not mark any letter twice.

. One answer has teen given as an example.

MEMORANDUM

To: Filma Williams ,school of Architecture

From : Ram S. Johnson ,Physical Plant Operations

Subject : Air-conditioning Installation Costs for East Hall.

Date : 4.4.94

As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in Eest Hall ... ...example....`. .

Office and Classroom installation

Estimates were obtained from three contractors on the costs of covering the offices and classrooms ... ... 8... ... The work would take about three weeks.

Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period......9...... Sheet metal work to build out lest in the classes could be done on weekends , and the overtime labour costs of about $1,500 have been included in the estimates.

Arrangements were not made to do the office space installation on weekends `.. ... 10... ..

Additional Installation

Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways ,an additional $6 , 000 would be required for the equipment. .....11 ...... If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ......12......

Summary

The total job for the building would be about $ 35, 000 if done at one time. A two-stage installation would cost about $55 ,000. I can get official bids at your request.

Example: A

A As you suggested, we also sought information on the additional cost of air

conditioning in the entrance halls and stairways.

B All these three were in the $ 20,000 to $25,000 range.

C This later installation would cost about $20,000.

D However, class interruption should be minimal.

E In the same way, each of these three would take at least one month.

F Therefore ,the total cost was this $6 ,000 plus another $5,000.

G Labour costs would be an additional S 5 ,000,bringing the total cost of the addition to $11 ,000.

H Each faculty member could expect to have workers in the office for about one day.

I So faculty members can continue their office work as usual.

相關(guān)內(nèi)容:

2012年1月商務(wù)英語每日一練匯總

(責(zé)任編輯:中大編輯)

2頁,當(dāng)前第1頁  第一頁  前一頁  下一頁
最近更新 考試動態(tài) 更多>
彩票| 曲周县| 拜城县| 宣城市| 南昌县| 佳木斯市| 宝清县| 阿坝| 新邵县| 临沂市| 轮台县| 黔西县| 太湖县| 和政县| 北碚区| 中牟县| 夹江县| 德惠市| 莱西市| 麟游县| 武功县| 英吉沙县| 珲春市| 东乌珠穆沁旗| 德阳市| 河西区| 长治县| 石景山区| 宜君县| 鄂托克前旗| 通辽市| 文成县| 湘西| 施秉县| 通化市| 云林县| 天柱县| 临江市| 万载县| 沙雅县| 宜川县|